Highway 29 – Current Planned
Highway 29. Mowing between the start of Highway 29 and Lone Prairie Rd for 48.8 km (Tumbler Ridge to 44 […]
Highway 29. Mowing between the start of Highway 29 and Lone Prairie Rd for 48.8 km (Tumbler Ridge to 44 […]
Highway 97. Maintenance between 86 St and 100 Ave for 3.7 km (Fort St John). Until Wed Aug 9 at
Cecil Lake (103) Road. Maintenance planned between Rose Prairie 101 Road and 251 Road near Fort St John. Starting Wed
Highway 97. Road maintenance work between 221 Rd and Orrin Powell Rd for 28.7 km (22 km south of Taylor
Highway 97, in both directions. Shoulder maintenance at Julia Frtg (10 km north of Fort St John). Until Tue Aug
Highway 97. Vehicle recovery planned between Taylor Bridge and McMahon Dr for 0.8 km (Taylor). Starting Sat Aug 5 at
Highway 77. Limited visibility with smoke between the start of Highway 77 and the end of Highway 77 for 137.6
Highway 97. Limited visibility with smoke between Sikanni Rd and Pipeline Mainline for 8.0 km (Fort Nelson). Last updated Fri
Highway 52 N (Heritage Highway), in both directions. Vehicle recovery planned between Brassey Rd and Bearhole Lake Rd (67 km
Highway 97, in both directions. Vehicle recovery planned between Taylor Bridge and McMahon Dr (Taylor). Starting Thu Aug 3 at