Highway 29 – Both Directions – Future Planned
Highway 29, in both directions. Bridge maintenance planned between Farrell Creek Rd and Upper Cache Rd for 29.9 km (4 […]
Highway 29, in both directions. Bridge maintenance planned between Farrell Creek Rd and Upper Cache Rd for 29.9 km (4 […]
Highway 97. Watch for slippery sections between 52nd St NW and Watkins Rd for 33.9 km (Chetwynd). Last updated Wed
Highway 97. Watch for slippery sections between Powder King Rd and Weiland Rd for 25.6 km (Chetwynd). Last updated Wed
Highway 29. Watch for slippery sections between Bullmoose Rd and Peace Canyon Access Rd for 105.3 km (42 km north
Highway 29. Watch for slippery sections between Halfway River Bridge and the end of Highway 29 for 35.2 km (Halfway
Highway 97 (Alaska Highway), in both directions. Road maintenance work between 259 Rd and Bens Rd for 14.5 km (Fort
Highway 97 (Alaska Highway). Watch for slippery sections between Taylor Bridge and Kitt Rd for 78.2 km (Taylor to 24
Highway 29. Watch for slippery sections between Johnson Creek Rd and Halfway River Bridge for 49.2 km (6 km south
Highway 97. Watch for slippery sections between 52nd St NW and 241 Rd for 77.1 km (Chetwynd to 18 km
Highway 97. Watch for slippery sections between 245 Rd and Taylor Bridge for 73.1 km (18 km south of Dawson