Highway 49 – Road Condition
Highway 49. Fog patches between the start of Highway 49 and the end of Highway 49 for 15.2 km (Dawson […]
Highway 49. Fog patches between the start of Highway 49 and the end of Highway 49 for 15.2 km (Dawson […]
Highway 2. Fog patches between the start of Highway 2 and the end of Highway 2 for 41.5 km (British
Highway 29, in both directions. Bridge maintenance planned at Dickebusch Bridge. Starting Tue Oct 24 at 8:00 AM MST until
Highway 29. Road sweeping planned between Halfway River Bridge and Thompson Rd for 16.9 km (17 km north of Halfway
Highway 29, in both directions. Bridge maintenance planned between Farrell Creek Bridge and Halfway River Bridge (1 km north of
Highway 97. Utility work planned between Kennedy Rd and Azu Sub Rd for 30.0 km (4 km south of Pine
Highway 29, in both directions. Utility work between 47th Ave NW and Jackfish Lake Rd for 3.1 km (Chetwynd). Until
Highway 97 (Alaska Highway). Limited visibility with smoke between Sikanni Rd and Pipeline Mainline for 8.0 km (Fort Nelson). Last
Highway 77. Limited visibility with smoke between the start of Highway 77 and the end of Highway 77 for 137.6
Highway 77. Limited visibility with smoke between the start of Highway 77 and the end of Highway 77 for 137.6