Highway 97 – Northbound – Future Planned
Highway 97, northbound. Electrical maintenance planned at 108 St (Fort St John). Starting Mon Aug 14 at 7:30 AM MST […]
Highway 97, northbound. Electrical maintenance planned at 108 St (Fort St John). Starting Mon Aug 14 at 7:30 AM MST […]
Highway 29. Road maintenance work planned between Reschke Rd and Farrell Creek Rd for 8.6 km (12 to 3 km
Highway 29. Road sweeping at Halfway River Bridge (1 km north of Halfway Rest Area). Until Thu Aug 10 at
Cecil Lake (103) Road. Maintenance planned between Rose Prairie 101 Road and 251 Road near Fort St John. Starting Thu
Highway 29. Mowing between the start of Highway 29 and Lone Prairie Rd for 48.8 km (Tumbler Ridge to 44
Highway 97. Maintenance between 86 St and 100 Ave for 3.7 km (Fort St John). Until Wed Aug 9 at
Cecil Lake (103) Road. Maintenance planned between Rose Prairie 101 Road and 251 Road near Fort St John. Starting Wed
Highway 97, in both directions. Shoulder maintenance at Julia Frtg (10 km north of Fort St John). Until Tue Aug
Highway 97. Road maintenance work between 221 Rd and Orrin Powell Rd for 28.7 km (22 km south of Taylor
Highway 97. Vehicle recovery planned between Taylor Bridge and McMahon Dr for 0.8 km (Taylor). Starting Sat Aug 5 at