Highway 97 – Both Directions – Future Planned
Highway 97, in both directions. Roadside brushing planned between Powder King Rd and Hasler Rd for 84.0 km (23 km […]
Highway 97, in both directions. Roadside brushing planned between Powder King Rd and Hasler Rd for 84.0 km (23 km […]
Highway 97. Road sweeping between Julia Frtg and 281 Rd for 4.1 km (10 to 15 km north of Fort
Highway 77. Limited visibility with smoke between the start of Highway 77 and the end of Highway 77 for 137.6
Milligan Creek Road (137). Maintenance planned between 257 Rd and Doig Road near Fort St John. Starting Tue Aug 8
Highway 29, in both directions. Utility work planned between Upper Cache Rd and Watson Rd for 9.8 km (4 to
Highway 29. Road maintenance work between Szoo Rd and Tompkins Frtg for 27.4 km (35 to 8 km north of
Highway 97. Road maintenance work planned between 245 Rd and Orrin Powell Rd (22 km south of Taylor). Starting Wed
Highway 29. Bridge maintenance planned between Lone Prairie Rd and Curtis Rd (9 km south of Chetwynd). Starting Mon Jul
Highway 29. Bridge maintenance planned between Monkman Way and Bullmoose Rd (5 km north of Tumbler Ridge). Starting Tue Aug
Highway 97. Limited visibility with fog between 52nd St NW and 241 Rd for 77.1 km (Chetwynd to 18 km