Highway 97 – Both Directions – Future Planned
Highway 97, in both directions. Road sweeping planned between Pine Ave and Cherry Ave for 1.0 km (Taylor). Starting Fri […]
Highway 97, in both directions. Road sweeping planned between Pine Ave and Cherry Ave for 1.0 km (Taylor). Starting Fri […]
Highway 77. Limited visibility with smoke between the start of Highway 77 and the end of Highway 77 for 137.6
Highway 97. Limited visibility with smoke between Taylor Bridge and Kitt Rd for 78.2 km (Taylor to 24 km south
Cecil Lake Rd (Highway 103). Limited visibility with smoke between Rose Prairie Rd and the end of Cecil Lake Rd
Highway 97. Special event planned between Kaps Ave and Old Hope Rd for 1.4 km (6 to 4 km north
Highway 97. Bridge maintenance planned between 245 Rd and Orrin Powell Rd (22 km south of Taylor). Starting Wed Jul
Highway 2. Bridge maintenance planned between Fletcher Rd and 192 Rd (6 km north of British Columbia and Alberta Border).
Highway 52 N (Heritage Highway). Mowing between the start of Highway 52 N (Heritage Highway) and the end of Highway
Highway 29. Bridge construction planned between Lone Prairie Rd and Curtis Rd (9 km south of Chetwynd). Starting Tue Jul
Highway 29, northbound. Utility work planned between Jackfish Lake Rd and Chetwynd Dump Rd for 0.4 km (2 km north