Highway 52 E – Current Planned
Highway 52 E. Road sweeping between Highway 2 and Stone Creek Rd for 69.0 km (144 to 75 km east […]
Highway 52 E. Road sweeping between Highway 2 and Stone Creek Rd for 69.0 km (144 to 75 km east […]
Highway 97. Road sweeping between Charlie Lake Frtg and Julia Frtg for 5.8 km (5 to 10 km north of
Highway 97, in both directions. Road sweeping between 86 St and 108 St for 2.8 km (Fort St John). Until
Highway 97, in both directions. Road maintenance work planned at 259 Rd (4 km south of Fort St John). Starting
Highway 97, in both directions. Road cleared between Powder King Rd and Old Hasler Rd (38 km south of Chetwynd).
Highway 97, in both directions. Road sweeping between 100 St and 269 Rd for 3.8 km (Fort St John). Until
Highway 97, in both directions. Road sweeping between 257 Rd and Julia Frtg for 20.0 km (Fort St John). Until
Highway 97, in both directions. Road sweeping between 259 Rd and Julia Frtg for 18.1 km (Fort St John). Until
Highway 97. Road sweeping between 20 St and Peace River Bridge for 52.9 km (Dawson Creek to 1 km south
Highway 97, southbound. Road sweeping planned between Bens Rd and Peace River Bridge for 26.2 km (Taylor to 7 km