Highway 97 – Both Directions – Current Planned
Highway 97, in both directions. Bridge maintenance between Big Bam Rd and McMahon Dr for 1.8 km (Taylor). From 9:00 […]
Highway 97, in both directions. Bridge maintenance between Big Bam Rd and McMahon Dr for 1.8 km (Taylor). From 9:00 […]
Highway 97. Road sweeping between Rimsmith Subdiv and Downtown Dawson Creek for 66.8 km (Dawson Creek to 29 km north
Highway 52 N (Heritage Highway). Watch for slippery sections between 200 Rd and the end of Highway 52 N (Heritage
Highway 52 E. Watch for slippery sections between Kelly Lake Rd and the end of Highway 52 E for 79.4
Highway 29. Watch for slippery sections between the start of Highway 29 and Lone Prairie Rd for 46.2 km (Tumbler
Highway 29, in both directions. Special event between Halfway River Bridge and Szoo Rd for 5.9 km (1 to 6
Highway 97, in both directions. Utility work between Mile 72 Frtg and Beatton Airport Rd for 2.3 km (40 km
Highway 2. Road sweeping between 201 Rd and 8 St for 36.8 km (Dawson Creek to 1 km north of
Highway 29. Watch for slippery sections between Johnson Creek Rd and Halfway River Bridge for 49.2 km (6 km south
Highway 29. Watch for slippery sections between Johnson Creek Rd and Halfway River Bridge for 49.2 km (6 km south