Highway 52 E – Future Planned

Highway 52 E. Bridge construction planned between Quintette Mine Rd and the end of Highway 52 E (3 km east of Tumbler Ridge). Starting Sun Oct 15 at 10:00 AM MST until Sun Oct 15 at 12:00 PM MST. Closed at the Flatbed Heritage Bridge 5 Km southeast of Tumbler Ridge for 2 hours. Last updated Fri Oct 13 at 3:33 PM MST. (DBC-57152)

Scroll to Top