Road Info

WEATHER CONDITIONS

  • Notice

    We now have new location pages! To ensure you are retrieving the location closest to you please visit weather.gc.ca/canada_e.html for all our new locations!

ROAD REPORTS & INCIDENTS

  • Highway 97 - Both Directions - Current Planned

    Highway 97, in both directions. Bridge construction between Powder King Rd and Old Hasler Rd (49 km south of Chetwynd). Single lane alternating traffic and detour at Fisher Creek Bridge. Estimated time of re-opening Thu Oct 31 at 7:00 AM MST. Next update time Thu Oct 31 at 7:00 AM MST. Last updated Mon Sep 16 at 9:06 AM MST. (DBC-66238)

  • Highway 97 - Both Directions - Current Planned

    Highway 97, in both directions. Construction work between Powder King Rd and Old Hasler Rd for 1.4 km (27 to 29 km north of Pine Pass Summit). Until Fri Sep 20. From 8:00 AM to 4:30 AM MST on weekdays. Single lane alternating traffic. Watch for traffic control. Avalanche Catchment Area Construction. Last updated Thu Sep 12 at 10:19 AM MST. (DBC-68192)

  • Highway 97 - Future Planned

    [Truncated] Highway 97 (Alaska Highway). Bridge maintenance planned between Taylor Bridge and McMahon Dr for 1.1 km (Taylor). Starting Mon Sep 23 at 7:00 PM MST until Sat Oct 12 at 3:00 AM MST. From 7:00 PM to 3:00 AM MST on weekdays. Single lane alternating traffic will be in effect. Expect major delays. Overweight and oversized loads exceeding width of 3.85m(12.6¿¿¿) required to wat until 3am to cross. To avoid lengthy delay, schedule oversized loads 7pm-3am. Call Angie Crawford with DRM 250-2

  • Highway 97 - Northbound - Future Planned

    Highway 97, northbound. Utility work planned between Kennedy Rd and Azu Sub Rd for 1.1 km (28 to 27 km south of Pine Pass Summit). Starting Thu Sep 19 at 8:00 AM PDT until Thu Sep 19 at 6:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. BC Hydro Pole Replacements. Last updated Wed Sep 11 at 3:29 PM PDT. (DBC-68163)

  • Highway 97 - Southbound - Future Planned

    Highway 97, southbound. Special event planned between 53rd St NW and Powder King Rd for 107.5 km (Chetwynd to 3 km south of Pine Pass Summit). Starting Sun Sep 22 at 8:00 AM PDT until Sun Sep 22 at 8:00 PM PDT. 2024 Cops for Cancer Tour De North Bicycle Tour. Watch for cyclists, slow moving vehicles and first responders. Last updated Tue Sep 10 at 9:24 AM PDT. (DBC-68086)

Scroll to Top