Highway 29 – Current Planned

Highway 29. Road sweeping between Monkman Way and Lone Prairie Rd for 42.6 km (Tumbler Ridge). Until Mon Jun 17 at 4:00 PM MST. Watch for slow moving vehicles. Last updated Mon Jun 17 at 7:01 AM MST. (DBC-65237)

Scroll to Top