Highway 97 – Both Directions – Future Planned

Highway 97 (Alaska Highway), in both directions. Paving operations planned between 107th Ave and Birch Ave for 2.2 km (Taylor). Starting Mon Jul 8 at 7:00 AM MST until Mon Jul 8 at 12:00 PM MST. Pothole repair planned. Detour planned. Expect delays. Lane closures in both directions planned. Reduced speeds to 50km /h, Detour on to 100th st. Next update time Mon Jul 8 at 12:00 PM MST. Last updated Sun Jul 7 at 4:46 PM MST. (DBC-65940)

Scroll to Top