Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Avalanche control activity is planned between Kennedy Rd and Azu Sub Rd for 2.1 km (22 to 19 km south of Pine Pass Summit). Starting Sat Feb 4 at 1:00 PM PST until Sat Feb 4 at 2:00 PM PST. Road closure planned. Next update time Sat Feb 4 at 2:00 PM PST. Last updated Fri Feb 3 at 8:10 PM PST. (DBC-48876)

Scroll to Top