Highway 29 – Road Condition

Highway 29. Blowing snow between Bullmoose Rd and Peace Canyon Access Rd for 105.3 km (42 km north of Tumbler Ridge to 6 km south of Hudson’s Hope). Watch for slippery sections. Last updated Thu Mar 2 at 4:07 PM MST. (DBCRCON-153967)

Scroll to Top