Highway 2 – Future Planned
Highway 2. Garbage pickup planned between 50th St and 8 St for 7.7 km (Dawson Creek to Pouce Coupe). Starting […]
Highway 2. Garbage pickup planned between 50th St and 8 St for 7.7 km (Dawson Creek to Pouce Coupe). Starting […]
Highway 29. Road sweeping between MacKenzie Way and Lone Prairie Rd for 44.4 km (Tumbler Ridge). Until Tue May 6
Highway 29. Bridge maintenance between the start of Highway 29 and Lone Prairie Rd for 47.8 km (Tumbler Ridge). Until
Highway 97. Road sweeping between Kloss Rd and Old Hasler Rd for 122.4 km (23 km south of Chetwynd to
Highway 2. Bridge maintenance planned between Independent Rd and Hanna Rd for 18.0 km (10 km north of British Columbia
Highway 97. Bridge maintenance planned between Kennedy Rd and Azu Sub Rd (22 km south of Pine Pass Summit). Starting
Highway 29, in both directions. Road sweeping between Johnson Creek Rd and the end of Highway 29 for 81.6 km
Highway 97 (Alaska Highway). Road sweeping between Taylor Bridge and Julia Frtg for 30.3 km (Taylor to 10 km north
Highway 2. Bridge maintenance between Old Edmonton Hwy and Fletcher Rd for 0.1 km (3 km north of British Columbia
Highway 52 N (Heritage Highway), in both directions. There is a wildfire between Brassey Rd and Bearhole Lake Rd for