Highway 49 – Future Planned
Highway 49. Garbage pickup planned between the start of Highway 49 and 207 Rd for 7.6 km (Dawson Creek). Starting […]
Highway 49. Garbage pickup planned between the start of Highway 49 and 207 Rd for 7.6 km (Dawson Creek). Starting […]
Highway 52 E, in both directions. Road sweeping between Highway 2 and Kelly Lake Rd for 32.8 km (144 to
Highway 52 E. Ditching between Kelly Lake Rd and Stone Creek Rd (75 km east of Tumbler Ridge). Until Fri
Highway 29. Limited visibility dense fog between Halfway River Bridge and the end of Highway 29 for 35.2 km (38
Highway 29. Fog patches between Johnson Creek Rd and Halfway River Bridge for 49.2 km (Hudson’s Hope). Last updated Fri
Cecil Lake Rd (Highway 103). Fog patches between Rose Prairie Rd and 243 Rd for 22.1 km (Cecil Lake). Last
Highway 52 N (Heritage Highway). Geotechnical investigation planned between Brassey Rd and Bearhole Lake Rd for 4.9 km (41 to
Highway 29. Road sweeping planned between Monkman Way and Lone Prairie Rd for 43.5 km (Tumbler Ridge). Starting Thu Jun
Highway 29, in both directions. Bridge maintenance at Halfway River Bridge (38 km north of Hudson’s Hope). Until Thu Jun
Highway 29. Road sweeping between Bullmoose Rd and Weiland Rd for 47.2 km (1 km south of Chetwynd to 42