Highway 29 – Future Planned
Highway 29. Utility work planned between Asleson Rd and Weiland Rd for 4.9 km (Chetwynd). Starting Mon Mar 24 until […]
Highway 29. Utility work planned between Asleson Rd and Weiland Rd for 4.9 km (Chetwynd). Starting Mon Mar 24 until […]
Highway 29, northbound. Bridge construction planned between Weiland Rd and N Access Rd for 3.0 km (Chetwynd). Starting Fri Mar
Highway 97 (Alaska Highway). Watch for slippery sections between Taylor Bridge and Kitt Rd for 78.2 km (Taylor to 24
Highway 29. Watch for slippery sections between Johnson Creek Rd and Halfway River Bridge for 49.2 km (Hudson’s Hope). Last
Highway 52 E. Watch for slippery sections between Kelly Lake Rd and the end of Highway 52 E for 79.4
Highway 52 N (Heritage Highway). Watch for slippery sections between 200 Rd and the end of Highway 52 N (Heritage
Highway 29. Watch for slippery sections between the start of Highway 29 and Lone Prairie Rd for 46.2 km (Tumbler
Highway 52 N (Heritage Highway). Watch for slippery sections between 200 Rd and the end of Highway 52 N (Heritage
Highway 52 E. Watch for slippery sections between Kelly Lake Rd and the end of Highway 52 E for 79.4
Highway 29. Watch for slippery sections between the start of Highway 29 and Lone Prairie Rd for 46.2 km (Tumbler