Highway 49 – Current Planned
Highway 49. Mowing between 103 Ave and the end of Highway 49 for 14.6 km (Dawson Creek to 1 km […]
Highway 49. Mowing between 103 Ave and the end of Highway 49 for 14.6 km (Dawson Creek to 1 km […]
Highway 97. Bridge maintenance between Powder King Rd and Old Hasler Rd for 36.4 km (40 km south of Chetwynd
Highway 97. Mowing between Hasler Rd and Access Rd for 23.5 km (Chetwynd). Until Mon Jun 24. Watch for slow
Highway 97. Fog patches between 52nd St NW and Watkins Rd for 33.9 km (Chetwynd). Last updated Sun Jun 23
Highway 29. Fog patches between Bullmoose Rd and Peace Canyon Access Rd for 105.3 km (42 km north of Tumbler
Highway 97 (Alaska Highway), in both directions. Bridge maintenance at Sikanni Chief Rd (92 km north of Wonowon). Single lane
Highway 97, southbound. Utility work planned between Old Hasler Rd and Powder King Rd for 17.0 km (26 to 9
Highway 29. Road sweeping between Monkman Way and Lone Prairie Rd for 42.6 km (Tumbler Ridge). Until Mon Jun 17
Highway 52 E. Road sweeping between Kelly Lake Rd and the end of Highway 52 E for 72.7 km (74
Highway 52 N (Heritage Highway). Road sweeping between 198 Rd and MacKenzie Way for 76.8 km (Tumbler Ridge). Until Mon