Highway 29 – Current Planned
Highway 29. Bridge maintenance between Monkman Way and Bullmoose Rd (5 km north of Tumbler Ridge). Until Mon Jun 3 […]
Highway 29. Bridge maintenance between Monkman Way and Bullmoose Rd (5 km north of Tumbler Ridge). Until Mon Jun 3 […]
Highway 29. Road sweeping between the start of Highway 29 and 53rd Ave NE for 93.4 km (Chetwynd to Tumbler
Rose Prairie Rd , in both directions. Utility work planned between O Large Ave and Jones Rd. Starting Wed Jun
Highway 29. Paving operations planned between Chetwynd Dump Rd and Moberly Lake Rd (7 km north of Chetwynd). Starting Sat
Highway 29, in both directions. Road maintenance work planned between Chetwynd Dump Rd and Moberly Lake Rd (7 km north
Highway 29. Road sweeping between Monkman Way and Lone Prairie Rd for 45.2 km (Tumbler Ridge to 44 km south
Highway 52 N (Heritage Highway). Road sweeping between Brassey Rd and Bearhole Lake Rd (46 km north of Tumbler Ridge).
Highway 97. Bridge maintenance between Powder King Rd and Old Hasler Rd (45 km north of Pine Pass Summit). Until
Highway 97. Bridge maintenance between Ganson Rd and Stone Creek Subdiv (14 km south of Chetwynd). Until Thu May 30
Highway 29. Garbage pickup planned between Lone Prairie Rd and Weiland Rd for 9.1 km (Chetwynd to 9 km south