Highway 52 E – Current Planned
Highway 52 E. Bridge maintenance between Northland Gas Rd and Core Lodge Rd (31 km east of Tumbler Ridge). Until […]
Highway 52 E. Bridge maintenance between Northland Gas Rd and Core Lodge Rd (31 km east of Tumbler Ridge). Until […]
Highway 52 E. Bridge maintenance planned between Northland Gas Rd and Core Lodge Rd (19 km east of Tumbler Ridge).
Highway 97. Road sweeping between Powder King Rd and Hasler Rd for 84.0 km (23 km south of Chetwynd to
Highway 97, in both directions. Paving operations planned between Westgate Rd NW and Weiland Rd for 1.3 km (Chetwynd). Starting
Highway 97, in both directions. Paving operations planned between 52nd St NW and Wabi Estates for 4.5 km (Chetwynd). Starting
Highway 29. Paving operations planned between Weiland Rd and N Access Rd for 3.0 km (Chetwynd). Starting Thu May 23
Highway 29. Garbage pickup planned between N Access Rd and Chetwynd Dump Rd for 4.5 km (Chetwynd). Starting Fri May
Highway 97. Maintenance planned between Fabrick Rd and Watkins Rd (32 km north of Chetwynd). Starting Tue May 21 at
Highway 97. Paving operations planned between Fabrick Rd and Watkins Rd (32 km north of Chetwynd). Starting Fri May 24
Highway 2. Road maintenance work planned between Arndt Rd and 209 Rd (6 km south of Pouce Coupe). Starting Fri