Highway 29 – Road Condition
Highway 29. Watch for slippery sections between the start of Highway 29 and the end of Highway 29 for 235.9 […]
Highway 29. Watch for slippery sections between the start of Highway 29 and the end of Highway 29 for 235.9 […]
Highway 49. Watch for slippery sections between the start of Highway 49 and the end of Highway 49 for 15.2
Highway 29, in both directions. Utility work planned between Upper Cache Rd and Watson Rd for 9.8 km (4 to
Highway 29, in both directions. Utility work between Upper Cache Rd and Watson Rd for 9.8 km (4 to 14
Highway 97. Limited visibility with snow between 52nd St NW and Downtown Dawson Creek for 97.0 km (Chetwynd to Dawson
Highway 97. Watch for slippery sections between Downtown Dawson Creek and Kitt Rd for 131.4 km (Dawson Creek to 24
Highway 29. Watch for slippery sections between the start of Highway 29 and the end of Highway 29 for 235.9
Highway 52 E. Watch for slippery sections between Highway 2 and Stone Creek Rd for 65.0 km (144 to 79
Highway 52 E. Watch for slippery sections between Kelly Lake Rd and the end of Highway 52 E for 79.4
Highway 97. Watch for slippery sections between 52nd St NW and Watkins Rd for 33.9 km (Chetwynd). Compact snow. Last