Highway 97 – Both Directions – Current Planned
Highway 97, in both directions. Road sweeping between 86 St and 108 St for 2.8 km (Fort St John). Until […]
Highway 97, in both directions. Road sweeping between 86 St and 108 St for 2.8 km (Fort St John). Until […]
Highway 97. Road sweeping between Charlie Lake Frtg and Julia Frtg for 5.8 km (5 to 10 km north of
Highway 97, in both directions. Road cleared between Powder King Rd and Old Hasler Rd (38 km south of Chetwynd).
Highway 97, in both directions. Road sweeping between 100 St and 269 Rd for 3.8 km (Fort St John). Until
Highway 97, in both directions. Road sweeping between 257 Rd and Julia Frtg for 20.0 km (Fort St John). Until
Highway 97, in both directions. Road sweeping between 259 Rd and Julia Frtg for 18.1 km (Fort St John). Until
Highway 97. Road sweeping between 20 St and Peace River Bridge for 52.9 km (Dawson Creek to 1 km south
Highway 97, in both directions. Bridge maintenance between Big Bam Rd and McMahon Dr for 1.8 km (Taylor). From 9:00
Highway 97, southbound. Road sweeping planned between Bens Rd and Peace River Bridge for 26.2 km (Taylor to 7 km
Highway 29. Watch for slippery sections between the start of Highway 29 and Lone Prairie Rd for 46.2 km (Tumbler