Highway 97 – Southbound – Future Planned
Highway 97, southbound. Bridge construction planned between Old Hasler Rd and Powder King Rd for 1.9 km (50 to 48 […]
Highway 97, southbound. Bridge construction planned between Old Hasler Rd and Powder King Rd for 1.9 km (50 to 48 […]
Highway 29. Watch for slippery sections between Halfway River Bridge and the end of Highway 29 for 35.2 km (38
Highway 29. Watch for slippery sections between Bullmoose Rd and Halfway River Bridge for 154.5 km (42 km north of
Highway 52 E. Blowing snow between Kelly Lake Rd and the end of Highway 52 E for 79.4 km (Tumbler
Highway 52 N (Heritage Highway). Blowing snow between 200 Rd and the end of Highway 52 N (Heritage Highway) for
Highway 29. Blowing snow between the start of Highway 29 and Lone Prairie Rd for 46.2 km (Tumbler Ridge). Limited
Highway 97. Watch for slippery sections between Powder King Rd and Weiland Rd for 25.6 km (Chetwynd). Last updated Wed
Highway 97. Watch for slippery sections between 52nd St NW and Watkins Rd for 33.9 km (Chetwynd). Last updated Wed
Highway 29. Watch for slippery sections between Bullmoose Rd and Peace Canyon Access Rd for 105.3 km (42 km north
Highway 52 N (Heritage Highway). Watch for slippery sections between 200 Rd and the end of Highway 52 N (Heritage