Highway 97 – Both Directions – Future Planned
Highway 97 (Alaska Highway), in both directions. Utility work planned between Lower Cache Rd and Mile 72 Frtg for 5.4 […]
Highway 97 (Alaska Highway), in both directions. Utility work planned between Lower Cache Rd and Mile 72 Frtg for 5.4 […]
Highway 97, in both directions. Industrial traffic may slow or block regular traffic. Between Powder King Rd and Old Hasler
Highway 97. Industrial traffic may slow or block regular traffic. Between Kennedy Rd and Azu Sub Rd for 0.3 km
Highway 97. Construction work between Caven Rd and Chetwynd Pulpmill Rd for 1.7 km (16 to 18 km north of
Highway 29, in both directions. Bridge maintenance planned between Ross St and 283 Rd for 68.2 km (Hudson’s Hope). Starting
Milligan Creek Road – Pederson’s Crossing Valley. Road maintenance work between 257 Rd and Doig Road. Until Fri Aug 30
Highway 97. Mowing between Waters Subdiv and 52nd St NW for 7.0 km (Chetwynd). Until Thu Aug 22 at 4:30
Highway 29, southbound. Utility work between Nicholson Rd and 47th Ave NW for 1.0 km (Chetwynd). Until Fri Aug 30.
Highway 29, in both directions. Bridge maintenance planned between Farrell Creek Bridge and Upper Cache Rd for 7.1 km (42
Highway 52 E. Mowing between Highway 2 and Stone Creek Rd for 69.1 km (144 to 75 km east of