Highway 29 – Current Planned

Highway 29. Mowing between MacKenzie Way and Lone Prairie Rd for 46.2 km (Tumbler Ridge). Until Thu Jul 13 at 4:00 PM MST. Watch for slow moving vehicles in the area. Last updated Thu Jul 13 at 9:12 AM MST. (DBC-54378)

Scroll to Top