Highway 29 – Road Condition

Highway 29. Watch for slippery sections between Bullmoose Rd and Peace Canyon Access Rd for 105.3 km (42 km north of Tumbler Ridge to 6 km south of Hudson’s Hope). Last updated Sat Feb 4 at 4:13 PM MST. (DBCRCON-149533)

Scroll to Top