Highway 29 – Road Condition

Highway 29. Watch for slippery sections between Bullmoose Rd and Peace Canyon Access Rd for 105.3 km (42 km north of Tumbler Ridge to 6 km south of Hudson’s Hope). Last updated Tue Mar 14 at 3:26 PM MST. (DBCRCON-155495)

Scroll to Top