Highway 29 – Road Condition

Highway 29. Limited visibility with fog between the start of Highway 29 and Peace Canyon Access Rd for 151.5 km (Tumbler Ridge to 6 km south of Hudson’s Hope). Watch for slippery sections. Compact snow. Last updated Sun Jan 15 at 5:22 PM MST. (DBCRCON-145797)

Scroll to Top