Highway 29 – Road Condition

Highway 29. Watch for slippery sections between Bullmoose Rd and Halfway River Bridge for 154.5 km (42 km north of Tumbler Ridge to 38 km north of Hudson’s Hope). Last updated Thu Apr 4 at 4:20 PM MST. (DBCRCON-185805)

Scroll to Top