Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Utility work between Mile 72 Frtg and Beatton Airport Rd for 2.3 km (40 km south of Wonowon to 39 km north of Fort St John). Until Thu Apr 6 at 4:00 PM MST. Shoulder closed. Work between Mile 72 and 73. Watch for traffic control personnel. Speed reduced to 70 km/h in work zone. Watch for vehicles on the shoulder. Last updated Thu Apr 6 at 9:01 AM MST. (DBC-50753)

Scroll to Top