Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Avalanche control activity is planned between Powder King Rd and Old Hasler Rd for 83.8 km (4 km south of Pine Pass Summit to 23 km south of Chetwynd). Starting Tue Jan 24 at 11:00 AM PST until Tue Jan 24 at 3:00 PM PST. Road closure planned. Avalanche control in the Pine Pass area. Closure for approximately 45 to 60 minutes. Next update time Tue Jan 24 at 3:00 PM PST. Last updated Sun Jan 22 at 9:35 PM PST. (DBC-48540)

Scroll to Top