[Truncated] Highway 97 (Alaska Highway). Bridge maintenance planned between Taylor Bridge and McMahon Dr for 1.1 km (Taylor). Starting Mon Sep 23 at 7:00 PM MST until Sat Oct 12 at 3:00 AM MST. From 7:00 PM to 3:00 AM MST on weekdays. Single lane alternating traffic will be in effect. Expect major delays. Overweight and oversized loads exceeding width of 3.85m(12.6¿¿¿) required to wat until 3am to cross. To avoid lengthy delay, schedule oversized loads 7pm-3am. Call Angie Crawford with DRM 250-2